Reading a mill test certificate: six checks before you accept steel

A mill test certificate is the steel’s birth certificate. It says what the material is, where it came from and how it performed when it was made. On most jobs in Guyana the certificate arrives with the steel from overseas, and it’s tempting to file it and move on.

Don’t. A few minutes with the certificate before the material goes into stock can save a very expensive conversation later. These are the six checks we run when a client asks us to verify material on receipt.

1. Does the heat number match the steel?

Every certificate is tied to a heat (or cast) number. That number should be stamped, stencilled or tagged on the plate, pipe or bar. If it isn’t on the material, or it doesn’t match the paper, the certificate doesn’t belong to that steel – no matter how good the numbers look.

2. Is it the right type of certificate?

Many projects call for an EN 10204 type 3.1 certificate, where the results come from tests on the actual product and are signed off by the manufacturer’s inspection department independent of production. A 2.2 document only reports typical results. If your specification says 3.1 or 3.2, a 2.2 isn’t a substitute.

3. Grade, standard and edition

“A36” and “A572 Grade 50” are different steels. So are API 5L PSL1 and PSL2. Check the grade, the standard and – where your specification is specific – the edition. Dual-certified material is common and fine, as long as both designations appear on the certificate.

4. Chemistry, including carbon equivalent

Compare each element against the limits in the material standard and any tighter limits in your project specification. For anything that will be welded, work out or check the carbon equivalent. A high CE means more preheat and more risk of hydrogen cracking, and it should be reflected in the welding procedure.

5. Mechanical properties

Yield, tensile and elongation should sit inside the specified range – not just above the minimum. Some specs also cap yield-to-tensile ratio. If impact testing is required, check the test temperature as well as the energy values. A good result at 0 °C doesn’t satisfy a –20 °C requirement.

6. Supplementary requirements and heat treatment

Normalised, quenched and tempered, sour-service hardness limits, through-thickness (Z) properties, ultrasonic testing of plate – if your purchase order asked for it, it should be on the certificate. Missing supplementary requirements are the most common gap we find.

When the certificate isn’t enough

Sometimes the paperwork is missing, illegible or doesn’t match the steel. That doesn’t always mean the material has to be scrapped. Verification testing – chemical analysis plus tensile and, if needed, impact tests on samples from the actual material – can establish what you have. Whether the result is acceptable is then a decision for your engineer and your client, but at least it’s based on facts.

We do this kind of verification testing in our Georgetown laboratory regularly. If you’ve got material with doubtful paperwork, get in touch before it gets welded in.