  • Hold points, witness points and why your ITP matters

    If you’ve worked on an oil & gas or major infrastructure job, you’ve seen an inspection and test plan – the ITP. It’s usually a long table with columns of letters: H, W, R, S, M. Fabricators sometimes treat it as paperwork for the client. It’s actually the most useful document on the job for avoiding arguments at handover.

    What an ITP does

    The ITP lists every inspection and test activity in the order the work happens: material receipt, cutting, fit-up, welding, NDT, dimensional checks, pressure testing, coating, final inspection and documentation. For each one it names the procedure or standard, the acceptance criteria, the record that will be produced, and who has to be involved.

    That last column is where the letters come in.

    Hold point (H)

    Work stops until the named party has inspected and released it. If the client’s inspector has a hold point on fit-up of a pressure-retaining weld, the welder doesn’t strike an arc until that inspector has seen the joint and signed off. Skipping a hold point is one of the quickest ways to get work rejected, regardless of how good it is.

    Witness point (W)

    The named party must be notified and given the chance to attend. If they don’t turn up after proper notice, work can continue. The notice period – often 24 or 48 hours – is written into the contract, so keep a record of when notifications were sent.

    Review (R), surveillance (S) and monitor (M)

    Review means the party checks the records rather than attending. Surveillance or monitoring means they may drop in at any time without stopping the work. Exact definitions vary between companies, so read the legend on each ITP.

    Where ITPs go wrong

    • Too generic. A template copied from another job lists tests that don’t apply and misses ones that do.
    • No acceptance criteria. “Visual inspection” without a code reference means everyone has a different idea of acceptable.
    • Notifications not tracked. When a witness point is missed, nobody can prove the notice was sent.
    • Records left to the end. Trying to assemble a dossier from memory after the job is finished almost always leaves gaps.

    How we help

    We prepare and review ITPs, attend hold and witness points as the third party or as the fabricator’s own QC, and keep the records together as the job progresses. When the steel is ready to ship, the dossier is ready too.

    More about our QA/QC inspection services →

  • Reading a mill test certificate: six checks before you accept steel

    A mill test certificate is the steel’s birth certificate. It says what the material is, where it came from and how it performed when it was made. On most jobs in Guyana the certificate arrives with the steel from overseas, and it’s tempting to file it and move on.

    Don’t. A few minutes with the certificate before the material goes into stock can save a very expensive conversation later. These are the six checks we run when a client asks us to verify material on receipt.

    1. Does the heat number match the steel?

    Every certificate is tied to a heat (or cast) number. That number should be stamped, stencilled or tagged on the plate, pipe or bar. If it isn’t on the material, or it doesn’t match the paper, the certificate doesn’t belong to that steel – no matter how good the numbers look.

    2. Is it the right type of certificate?

    Many projects call for an EN 10204 type 3.1 certificate, where the results come from tests on the actual product and are signed off by the manufacturer’s inspection department independent of production. A 2.2 document only reports typical results. If your specification says 3.1 or 3.2, a 2.2 isn’t a substitute.

    3. Grade, standard and edition

    “A36” and “A572 Grade 50” are different steels. So are API 5L PSL1 and PSL2. Check the grade, the standard and – where your specification is specific – the edition. Dual-certified material is common and fine, as long as both designations appear on the certificate.

    4. Chemistry, including carbon equivalent

    Compare each element against the limits in the material standard and any tighter limits in your project specification. For anything that will be welded, work out or check the carbon equivalent. A high CE means more preheat and more risk of hydrogen cracking, and it should be reflected in the welding procedure.

    5. Mechanical properties

    Yield, tensile and elongation should sit inside the specified range – not just above the minimum. Some specs also cap yield-to-tensile ratio. If impact testing is required, check the test temperature as well as the energy values. A good result at 0 °C doesn’t satisfy a –20 °C requirement.

    6. Supplementary requirements and heat treatment

    Normalised, quenched and tempered, sour-service hardness limits, through-thickness (Z) properties, ultrasonic testing of plate – if your purchase order asked for it, it should be on the certificate. Missing supplementary requirements are the most common gap we find.

    When the certificate isn’t enough

    Sometimes the paperwork is missing, illegible or doesn’t match the steel. That doesn’t always mean the material has to be scrapped. Verification testing – chemical analysis plus tensile and, if needed, impact tests on samples from the actual material – can establish what you have. Whether the result is acceptable is then a decision for your engineer and your client, but at least it’s based on facts.

    We do this kind of verification testing in our Georgetown laboratory regularly. If you’ve got material with doubtful paperwork, get in touch before it gets welded in.