Lot 319 Eccles Industrial Site, East Bank Demerara, Guyana · We work 24/7Phone/WhatsApp +592-602-5664 · Suriname +1-778 951 9480 · admin@kheeran.gy
Home / Welding Inspection

Welding inspection in Guyana

Visual weld inspection, procedure and welder qualification, and code compliance checks for fabricators, contractors and project owners.

Before, during, after

Most weld problems are cheaper to catch before the arc is struck

A weld that fails radiography or a bend test usually started going wrong earlier: the wrong consumable, a joint prepared outside tolerance, a welder working beyond their qualified range, or preheat that was skipped on a cold morning. Our inspectors look at all of it, not just the finished bead.

We inspect to the code your contract names – AWS D1.1 for structural steel, ASME IX and B31.3 for process piping, API 1104 for pipelines – and record what we find in a way your client’s inspector can follow.

  • WPS and PQR review against the code and the job
  • Welder qualification records and continuity checks
  • Material and consumable verification
  • Fit-up, root gap, bevel and alignment checks
  • Preheat, interpass temperature and heat input
  • Visual inspection of completed welds with measurements
  • Repair tracking and re-inspection

Services

Welding inspection services

Visual weld inspection

Profile, undercut, porosity, cracks, reinforcement and size measured against the acceptance criteria, with photos of anything rejected.

WPS / PQR support

We help write procedures, witness the PQR weld, then test the coupons in our own lab – one team from welding to report.

Welder qualification

Welder tests witnessed and coupons bend- or radiograph-ready, with WPQ records prepared for your quality file.

Codes

Codes we inspect to

CodeScope
AWS D1.1Structural steel – buildings, platforms, frames, skids
ASME Section IXProcedure and welder qualification for pressure work
ASME B31.3Process piping fabrication and inspection
API 1104Pipeline welding and nick-break testing
Project specificationsOperator and EPC requirements layered on top of the code

Starting a fabrication job?

Bring us in at the procedure stage. It is the cheapest point to fix a welding problem.

Request a quote